Here's the short version. A planning permit asks whether your proposal is an appropriate use of the land. A building permit asks whether what you intend to build is structurally sound and compliant with the construction code. Different questions, different assessors, different timelines.
The planning permit
A town planning permit is issued by your local council under the relevant planning scheme. The planner assessing it is looking at land use, neighbourhood character, setbacks, overshadowing, overlooking, garden area, private open space, car parking and vegetation. In other words: how your proposal sits in its context.
Not every project needs one. A single dwelling on a standard lot in a General Residential Zone with no overlays often doesn't. But you'll almost certainly need one for a second dwelling, a multi unit development, a subdivision, anything in a heritage or environmental overlay, most commercial changes of use, and often a second storey in a character area.
Timelines are the hard part. Councils have statutory timeframes, but requests for further information pause the clock and advertising adds weeks. Plan for months rather than weeks.
The building permit
A building permit is issued by a registered building surveyor — not by council — under the Building Act 1993. The surveyor is assessing compliance with the National Construction Code: structural adequacy, fire separation, energy efficiency, waterproofing, access, and so on.
Almost all construction needs one. New homes, extensions, second storeys, garages and carports over a certain size, decks over a certain height, re-stumping, demolition, swimming pools and safety barriers.
Building permits move much faster than planning permits — but only if the documentation package is complete. That means architectural working drawings, structural engineering, a soil report, an energy rating report, title documents, and the endorsed planning permit if one was required.
Planning first, then building. If your project needs both and you prepare building permit documentation before the planning permit is endorsed, council-requested changes will mean redrawing work you've already paid for.
What the difference means in practice
- Different assessors — a council planner versus a registered building surveyor. They don't talk to each other on your behalf.
- Different documents — planning drawings show context, character and compliance with ResCode. Working drawings show how to build it.
- Different failure modes — a planning application fails on amenity and character grounds. A building permit application stalls on missing consultant reports.
- Different timelines — months versus weeks, which matters a great deal for holding costs on a development.
Where a building designer fits
Draft Wing prepares both sets and manages both processes. We check the title and planning scheme first so we can tell you which approvals you actually need, prepare the town planning application and see it through council, then produce the working drawings and coordinate the engineering, energy report and soil report before lodging the building permit with a registered building surveyor.
The advantage of one practice doing both isn't just convenience. It's that the construction documentation is drawn from the endorsed planning drawings, so what council approved is what gets built — and nobody discovers a discrepancy at frame stage.
A few common misconceptions
"I have a planning permit, so I can start building." No. A planning permit is permission for the use and development in principle. You still need a building permit before work starts.
"My builder handles the permit." Sometimes, and sometimes not. Clarify who is engaging the building surveyor and who owns the documentation. Ambiguity here causes real delays.
"It's a small job, I don't need anything." Some minor works are exempt, but the exemptions are narrower than most people assume. Ask before you start rather than after.