(03) 9070 4747 Tullamarine · Melbourne VIC
Registered Building Designer
Town Planning Melbourne

Planning permits,
start to finish.

We prepare town planning applications, lodge them, argue them through council, and answer the requests for further information — so you are not learning the planning scheme on the job.

01 — First question

Do you actually need
a planning permit?

Dual occupancy approved under a town planning permit in Melbourne

Plenty of people call us assuming they need a town planning permit in Melbourne when they don't, and a few call assuming they don't when they very much do. The second group is the expensive one.

The answer sits in three places: the zone your land is in, any overlays sitting over the title, and what exactly you're proposing to build. A single house on a normal lot in the General Residential Zone with nothing over it usually needs only a building permit. Add a second dwelling, cut the block in two, or touch a property inside a Heritage Overlay, and you're in planning.

Usually needs a planning permit

  • A second dwelling — dual occupancy, townhouses, unit development.
  • Subdivision, whether or not you're building anything.
  • Anything in a Heritage, Neighbourhood Character, Significant Landscape, Design and Development, Special Building or Bushfire Management Overlay.
  • Most second storeys in a character-controlled area.
  • Commercial change of use, and most signage.
  • Removing protected vegetation.

Usually doesn't

  • A single new home on a standard lot in the General Residential Zone with no overlays — a knockdown rebuild often falls here.
  • A ground floor extension at the rear that keeps within setbacks and doesn't overshadow a neighbour.
  • Most garages, carports, decks and sheds within the standard limits.

The honest version is that these lists have exceptions, and the exceptions are where money gets lost. So we do a title search and a planning scheme check before quoting anything. It takes us an afternoon and it has saved clients months.

Have us check your title
02 — The submission

What goes into a
planning application

/ DOCUMENTS
01

Existing conditions plan

What's on the site today — buildings, levels, vegetation, crossovers, and the neighbouring structures that will shape what you're allowed to do.

02

Proposed plans and elevations

Dimensioned floor plans, every elevation, sections where the levels need explaining, and a materials and finishes schedule.

03

Neighbourhood and site description

The context plan. It shows council how your proposal sits among its neighbours, and it is the sheet planners look at hardest in character-sensitive areas.

04

Shadow diagrams

Overshadowing modelled at 9am, midday and 3pm on the equinox, against the neighbours' private open space.

05

Garden area and open space calculations

Garden area, site coverage, permeability and private open space — the numbers that decide yield, cross-checked so they reconcile across every sheet.

06

ResCode assessment

A written, clause-by-clause response to Clause 54 or 55. Leaving this out is one of the fastest ways to earn a Request for Further Information.

07

Supporting reports

Arborist, traffic, waste management, sustainable design assessment, land survey — whatever your particular council and overlay require.

03 — What we take on

Applications we
lodge every week

/ 06
Dual occupancy planning permit application in Melbourne

Dual Occupancy Melbourne

Two dwellings on one lot — the most common planning application we prepare, and the one where frontage and garden area decide everything.

Read more
Townhouse development planning permit Melbourne

Townhouse Development Melbourne

Three, four or more dwellings. Yield matters, but so does whether anyone wants to live in them — planners notice the difference.

Read more
Unit development planning application Melbourne

Unit Development Melbourne

Larger sites with a common driveway, waste and traffic reports, and a longer list of consultants to keep in step.

Read more
Extension planning permit in a heritage overlay, Melbourne

Extensions & Second Storeys

Where a heritage or character overlay, or a first floor addition, tips an otherwise simple extension into planning territory.

Read more
Granny flat planning permit Melbourne

Granny Flats & Second Dwellings

Dependent person's units and permanent second dwellings. Two different planning paths, and picking the wrong one costs months.

Read more
Subdivision planning permit and plan of subdivision Melbourne

Subdivision

Splitting titles, with or without a build. Best thought about at concept stage rather than bolted on at the end.

Read more
04 — How it runs

From title search
to endorsed plans

/ TIMELINE
STAGE 01

Feasibility

Title, zone, overlays, covenants and easements. We tell you what the site allows before you pay for a design.

STAGE 02

Design & Documentation

Concept options, then the full drawing set with every calculation reconciled across sheets.

STAGE 03

Lodgement & RFI

We lodge, then answer council's Request for Further Information. Complete submissions get fewer of these.

STAGE 04

Decision & Endorsement

Advertising if required, then permit and endorsed plans — which become the basis for your building permit.

Realistic timeframeThree to four months for a straightforward application. Longer with objections.
The 60 day clockIt pauses on every RFI and excludes advertising — which is why complete lodgement matters.
05 — Where we work

Councils we know well

Every council in Victoria reads the same planning scheme, and every council reads it slightly differently. Knowing that in advance is most of the job.

  • Hume
  • Brimbank
  • Merri-bek
  • Moonee Valley
  • Whittlesea
  • Melton
  • Wyndham
  • Darebin
  • Hobsons Bay
  • Maribyrnong
  • Banyule
  • Nillumbik

Not on the list? We take work across metropolitan Melbourne and into regional Victoria — ask and we'll tell you honestly whether we're the right fit for your council.

06 — Common questions

Planning permit FAQs

/ HELP

How do I know if I need a town planning permit?

Zone, overlays and proposal. A single dwelling on a standard General Residential lot with nothing over the title usually doesn't need one. A second dwelling, a subdivision, most commercial changes of use, and anything inside a heritage or environmental overlay almost always does. Send us the address and we'll check the title and planning scheme for you.

How long does a planning permit take in Melbourne?

Councils work to a statutory 60 days, but that clock stops every time a Request for Further Information is issued, and it doesn't cover the advertising period. In practice, a straightforward application runs three to four months. One that's advertised and attracts objections can run past nine. Anyone who promises you six weeks is guessing.

What is garden area, and why does everyone keep mentioning it?

It's the percentage of your lot that has to stay unbuilt and uncovered, at minimum dimensions. Driveways and most paving don't count. On a lot of Melbourne blocks it's the control that caps yield before setbacks or overshadowing even come into it — which is why we calculate it before drawing rather than after.

A neighbour has objected. Is my application dead?

No. Objections are weighed against the planning scheme, not counted. A well-documented proposal that complies is defensible, and objections raising matters the scheme doesn't protect carry little weight. If council refuses or imposes conditions you can't live with, the matter can go to VCAT — where the quality of your documentation does a lot of the work.

Can I start building once the planning permit is issued?

Not yet. A planning permit approves the use and development in principle. You still need a building permit from a registered building surveyor before work starts. We prepare the working drawings from the endorsed planning drawings and manage that stage too.

What does a planning application cost?

Our fee depends on scope — a single extension in a heritage overlay and a six-unit development are very different jobs. Council application fees are set separately and scale with the value of works. Send us the address and a short brief and we'll come back with a fixed fee rather than an hourly estimate.
07 — Free site check

Send us an address.
We'll read the title.

Tell us where the site is and what you're hoping to do. We'll come back with the zone, the overlays, whether a planning permit is required, and a fixed fee if you want us to run it.

Town planning enquiry form

Please tell us your name.
Please enter a valid email address.
We need the address to check the zone and overlays.

No charge for the first look. We'll tell you if you don't need us.

Ready when you are

Let's find out what your site can do.

(03) 9070 4747