House Extension Permit Melbourne: What You Need to Know in 2027

House extension permit Melbourne in 2027? Learn when you need a planning permit, building permit and how zones, overlays and lot size affect approval.

House extension permit Melbourne: what you need to know

Planning a house extension in Melbourne?

In Victoria, a house extension can require a planning permit, a building permit, or both. The answer depends on factors such as your property's planning zone, overlays, lot size and the design of the proposed work.

A common misconception is that every second-storey addition needs a planning permit, or that a property on a larger block is automatically exempt. Neither is a safe assumption. The controls applying to the individual property must be checked before the design is finalised.

Do I need a planning permit for a house extension in Melbourne?

Not every house extension needs a planning permit, but many do. The first step is to check the planning controls applying to your property.

The most reliable starting point is the Victorian Government's Planning Property Report. Search your property address and download the report. It identifies the planning zone and overlays and links to the relevant provisions of the local planning scheme.

Important: A property report is a starting point, not a complete permit decision. You still need to read the relevant zone, overlay schedules and other planning scheme provisions against the actual extension design.

The 300 square metre rule: when Clause 54 applies

The Victorian Government's Single home code guidance says Clause 54 applies to single dwellings and small second dwellings, including alterations and extensions, where both of the following conditions are met:

  1. The lot is less than 300 square metres; and
  2. The land is in a Residential Growth Zone, General Residential Zone, Neighbourhood Residential Zone, Housing Choice and Transport Zone, Mixed Use Zone or Township Zone.

Where these conditions apply, a planning permit is required and the Clause 54 assessment forms part of the planning permit process.

In most cases, Clause 54 does not apply to a single dwelling or small second dwelling on a lot greater than 300 square metres in a residential zone. The relevant residential development standards are generally assessed as part of the building permit application instead.

That distinction is important, but it does not mean that every property over 300 square metres is free from planning permit requirements. An overlay, a zone schedule or another provision of the planning scheme may still require a permit.

What changed under Clause 54?

Clause 54 was amended on 8 September 2025 through Amendment VC282. The changes introduced a deemed-to-comply assessment approach and changed the way eligible applications are considered through VicSmart.

Where a proposal meets an applicable standard, the corresponding objective is taken to be met. If a standard is not met, the responsible authority must consider the applicable decision guidelines in deciding whether the relevant objective is met.

These provisions were already in effect before 2027. They are not a new 2027 permit requirement.

Can an overlay mean I need a planning permit?

Yes. Even if Clause 54 does not apply to your property, a planning overlay or another planning scheme provision may trigger a planning permit.

For example, a property affected by a Heritage Overlay may require a permit for building work, subject to the exemptions and controls in Clause 43.01 and the property's overlay schedule. The schedule matters: it can identify specific controls and requirements for the heritage place.

Garden area requirements for house extensions

The minimum garden area requirement applies in the General Residential Zone and Neighbourhood Residential Zone when constructing or extending a dwelling on a lot of 400 square metres or more, subject to the applicable exclusions and schedule provisions.

The minimum percentage is based on the size of the lot:

  • 400–500 m²: 25%
  • Above 500 m² up to 650 m²: 30%
  • Above 650 m²: 35%

Garden area is not simply the total area of open space shown on a plan. The planning scheme definition sets out what can and cannot be counted. For example, the dwelling itself is excluded, as are covered driveways and covered car parking areas; uncovered driveways and car parking can be counted.

There are exceptions. These can include certain existing buildings that did not comply when the requirement was introduced, qualifying strategic or medium-density sites, and land where a General Residential Zone schedule switches off the requirement.

The requirement does not apply universally to every residential zone or every lot. Check the current zone provisions, schedule and relevant planning practice guidance for the property.

For an extension, this matters because increasing the building footprint can reduce the garden area remaining on the site. It is worth checking the calculation early, rather than redesigning the extension after plans have been prepared.

Does a second-storey extension need a planning permit?

A second storey does not automatically require a planning permit just because it adds an upper floor. The answer depends on the property's planning controls and the proposed design.

For a property where Clause 54 applies, matters such as building height, overlooking and overshadowing are considered through the planning assessment. Eligible applications may be assessed through VicSmart if they meet the relevant criteria; otherwise, the standard planning process may apply.

Where Clause 54 does not apply, the relevant residential siting and amenity requirements are generally assessed through the building permit process under the Building Regulations.

Do I need a building permit for a house extension?

In most cases, yes. A planning permit and a building permit are different approvals and serve different purposes.

The Victorian building authority's guidance explains that the exemption for certain building alterations does not cover work that increases or decreases a building's floor area or height. A typical house extension changes the floor area, height or both, so it will generally require a building permit.

Do not start building work on the assumption that a planning permit is enough. The required building permit must also be issued before work that requires one begins.

What do Victoria's 2027 gas rules mean for a house extension?

Victoria's move towards all-electric buildings has important dates in 2027, but the rules should not be confused with the planning permit tests for an ordinary extension.

From 1 January 2027, new homes and most new commercial buildings covered by the rules can't be connected to mains (reticulated) gas, which the Victorian Government describes as all-electric. The requirements apply to relevant building permits issued on or after that date, subject to the stated transitional arrangements and exceptions.

The Victorian Government's guidance also explains that existing buildings already connected to gas can remain connected. If the home is already connected, gas supply can be increased or extended to service new parts of it. A home without a gas connection can't be newly connected from 1 January 2027, and a building permit can't be issued where the work involves a new reticulated gas connection.

From 1 March 2027, a gas hot water system in an existing home that reaches end of life and needs replacement must generally be replaced with an electric alternative. Existing gas cooking and space-heating appliances are not required to be removed under this hot-water replacement rule.

For current details, refer to the Victorian Government's guidance on existing residential buildings and new residential buildings.

Planning a house extension in Melbourne? Check the approvals before you design

Draft Wing has been providing building design and drafting services since 2010. We prepare house extension plans, town planning permit applications and building permit drawings for residential projects across metropolitan Melbourne.

Explore our house extension design services or learn about our town planning services.

Draft Wing Building Design
Unit 1A, 34 Carrick Drive, Tullamarine VIC 3043
Phone: (03) 9070 4747
Email: info@draftwing.com.au

Frequently asked questions

How much garden area do I need to keep for an extension?

In the General Residential Zone and Neighbourhood Residential Zone, a minimum garden area requirement generally applies to extensions on lots of 400 square metres or more. The required area is 25%, 30% or 35%, depending on lot size, subject to applicable exclusions and schedule provisions.

This article provides general information about Victorian planning and building requirements as at 24 November 2026. It is not advice about a particular property or proposal. Planning controls, exemptions and building requirements can change and must be checked against the current planning scheme, legislation and the details of the proposed work. Confirm requirements with the relevant council and a registered building surveyor before proceeding.